The installation sequence of cooling tower
2017-04-13 09:01:36http://www.szdxj.com admin
The installation sequence of cooling tower
Simple installation procedure of cooling tower
Appropriate installation site:
Installation of water tower location to pay attention to the load and ventilation conditions and floor bearing capacity.
Pre - cement foundation, and installation of water tower support;
In accordance with the instructions, - concrete and steel frame foundation, and then the water tower chassis to support ring assembled into a frame shape, the level must be unified. Note that the central position of the middle position of naser-80 or above can not be ignored.
Install water tank and chassis:
The water tank is arranged on the central base.
Seal between the basin and the body;
As the water tower is a multi combination, so after the installation, the need for the preparation of fiber mortar sealing gap. More than 60T.
Installation of water overflow, floating ball combination and filter;
The overflow device, the floating ball combination and strainer placed in the preset place, be wrapped hose joint tape in laryngeal teeth.
Installation of central tube, central tube bundle and body support;
The center throat should be installed vertically on the throat of the sink, and then the central tube bundle is arranged on the center. ZLC need to install sound insulation, in the installation of pillars.
Installation of heat transfer film support and cooling film;
Connect the radiator bracket to the central tube, but must ensure that the horizontal vertical. Check the parts with a string of screws, and then put together a cooling film. Note: if you need to step on the installation of other equipment on the shelf, please first board temporary pad on the radiator bracket.
Mounting enclosure and ladder;
Place the housing around the body support, and then surround the heat sink assembly and tighten the screws. In the early development of installation on the support ladder.
Installation of sprinkler tube and water spray pipe;
The spray head is arranged at the top of the central tube throat, and then the hanging pipe device is sheathed on the spray head, and the water spraying pipe is horizontally pushed into the spray head, and the pull rod and the pull hook are used to make the tension control until the water spray pipe is in a horizontal position. Water spray hole and vertical line to 10 degrees back installation. At run time, do the final set-up as required
Install motor, motor frame and fan;
Position the motor frame at the top of the shell body, and then put the motor and the reducer, the current is equipped with fan combination, and finally with the fan mesh and belt cover.
Note;
80 the following water tower to pre install the motor, the motor frame and fan assembly before loading.
More than 100 of the fan angle according to the demand of air and set the tone for the school.
First, install the air duct, install the motor, the motor frame and the fan.
Installed in the ventilation network:
The net flat wind in the gap between the pillar and the pillar on the plastic screw can be tightened.
Note: need to install sound insulation skirt.
For more information please contact us: Mr. Wang 13923464030 Tel: 0755-81715045 or visit our website: http://www.szdxj.com

24小时服务电话:400-041-8118

销售专线:13923464030

公司电话:0755-81715045  0755-81715587

公司传真:0755-81715085

公司邮箱:szwj1688@163.com

公司官网:www.szdxj.com www.szdxzl.cn

工厂地址:深圳市龙华区观澜樟坑径下围工业区一路东星产业园


  • official micro letter

  • official microblogging

Feedback在线留言
Copyright; Shenzhen City, East Star Refrigeration Technology Co., Ltd. Guangdong -2 09046816 ICP