The specific operation steps of the refrigerant recovery from the industrial chiller to the reservoir
2017-02-20 08:35:52http://www.szdxj.com admin
The specific operation steps of the refrigerant recovery from the industrial chiller to the reservoir
Shenzhen Dongxing Refrigeration Electrical Co., Xiaobian for you to explain, as long as the industrial chiller refrigerant recovery, then the suction side pressure gauge pressure is 0.01MPa, after the closed compressor operation, if the pressure does not rebound that refrigerant recovery is completed, if the pressure rise is that no refrigerant recycling clean. In accordance with the following methods should be operated again:
1, open the industrial chiller cooling system all the valves, and counterclockwise twist the suction valve to allow it to be in full open state, and then use the multi-purpose joint repair valve and the suction valve connected.
2, close the repair valve, then the suction valve to three position.
3, clockwise rotation, in order to close the outlet valve of the reservoir.
4, the start of the industrial chiller refrigeration compressor, evaporator, the main force that is inhaled into the condenser and the reservoir.
If you want to know more details, please consult Mr. 0755-81715045/13923464030, or visit the website http://www.szdxj.com.