Method for self repairing when cold water machine fails
2017-04-12 09:31:20http://www.szdxj.com admin
When we use the industrial chiller in the normal production process, may be more or less such as some small problems, such as: sometimes there is no cooling water opportunity, we can not play the desired effect, and now as the summer temperatures continue to rise, in order to meet the needs of industrial production we will the chiller cooling capacity to the highest, some even 24 hours without stopping, then in the continuous high load operation, cold water machine is prone to failure. Here are a few of our analysis:
1, such as the screw type chiller, related to the protection of the set value of the factory has been set up, the user can not arbitrarily change.
2, non emergency situations can not cut off the main power supply to close the unit; cold water units in the long-term use, should shut down the unit, and then shut down the main power supply, and put the water in the system.
3, the unit failure alarm shutdown, press the stop button of the unit, and then check the cause of the fault or contact the manufacturer directly, before the failure is not forced to run the boot.
4, such as the equipment is air-cooled chiller should be turned on the fan to see whether the right turn, such as positive turn can be turned on, reversing the power supply wiring is reversed, to replace the phase sequence and then start.
5, clean room with good ventilation, regular cleaning of condenser dirt removing work, ensure the normal and stable operation of chiller.
6, cold water machine in normal operation, to the machine cooling.